Define the post-construction cleaning scope
We confirm the property, current condition, priority rooms, materials, access, timing, and the result you need.
Post-Construction Cleaning begins after trades are finished and tools, protective materials, and heavy debris have been removed. The goal is to lift settled dust, detail new finishes, and prepare completed rooms for styling, inspection, or occupancy.
Request an assessmentWe review the renovation area, material notes, remaining labels or adhesive, access conditions, and the builder punch list before confirming the scope. Delicate new surfaces are approached carefully, and anything that appears damaged or incomplete is documented rather than treated as a cleaning problem.
A renovated property may need more than one pass because fine dust continues to settle. The quote will distinguish an initial clean, a detail clean, and any final touch-up requested after other vendors leave.

A property-specific sequence keeps access, finish notes, priorities, and the final review aligned from the estimate through the handoff.
We confirm the property, current condition, priority rooms, materials, access, timing, and the result you need.
Included work, exclusions, product preferences, arrival details, and route availability are clarified before service.
The team follows the agreed priorities, reviews visible details, and carries useful feedback into the next step or visit.
Reachable cabinetry, millwork, ledges, fixtures, appliance exteriors, walls, and floors are vacuumed or wiped using methods suited to the finish. The sequence works from high surfaces downward so settled dust is not moved onto completed areas.
We do not remove heavy rubble, operate around active construction, or handle regulated dust such as asbestos, lead, or uncontrolled silica. Those conditions require appropriately qualified specialists.


Cabinet fronts and accessible interiors, counters, backsplash, fixtures, appliance exteriors, and floor edges can be detailed after installers finish. Manufacturer instructions and builder notes should be available for specialty coatings or newly sealed surfaces.
Adhesive, paint, grout haze, or protective film is addressed only when removal is safe and included in the quote. Scraping, polishing, sealing, and correction of trade defects are outside routine cleaning.
Accessible interior glass, mirrors, frames, tracks, hardware, and fixtures are cleaned once nearby work is complete. Exterior or high-access glass is evaluated separately for safe reach and equipment needs.
A final walkthrough focuses on the areas listed in the approved scope. It does not replace the contractor punch list or certify that construction work is complete.

Use these details to understand fit, prepare the property, protect its finishes, and compare the proposed scope with the result you actually need.
Service chapter
Post-construction cleaning starts only after the work reaches an agreed release point. Trades should be complete in the included rooms, tools and heavy debris removed, wet coatings cured according to their makers, and basic utilities safely available. The contractor or owner identifies any zone that remains active, isolated, or unfinished. We review the schedule, floor plan, access route, delivery activity, and target use after cleaning. A residence being prepared for furniture needs a different final sequence from a project still awaiting a punch-list inspection. Starting too early can redistribute dust, expose new finishes to unnecessary traffic, and create repeated work without delivering a stable result. Readiness is therefore a project decision, not merely an open date on the calendar. Record the room-release date and responsible trade so a later return can be tied to the schedule rather than treated as unexplained cleaning failure.
The site representative should also confirm that regulated or hazardous conditions have been assessed and controlled by the appropriate professionals. Suspected asbestos, lead, uncontrolled silica, chemical residue, sewage, biological contamination, fire residue, and significant water damage are not routine detail-cleaning assignments. We do not disturb unknown material to determine what it is or treat a visual improvement as environmental clearance. Exposed wiring, unstable installations, missing guards, blocked exits, unsupported glass, open penetrations, and unsafe access require correction before the affected area is released. If conditions change after arrival, we stop in that zone, protect ordinary equipment from contamination, and contact the named authority. Schedule pressure never converts an uncontrolled jobsite into a safe finished interior. Keep any environmental clearance with project management; the cleaning record may reference release status but should not reinterpret sampling, reports, or specialist conclusions.
Service chapter
A useful pre-clean walkthrough includes the owner or representative, general contractor, and cleaning lead, with designer, installer, or property management input where needed. We identify rooms, new finishes, retained finishes, cabinetry interiors, appliances, glass, tracks, fixtures, floors, labels, films, and ordinary fine dust included in the work. Manufacturer care sheets, sealant or coating cure information, installer restrictions, and samples help prevent similar-looking materials from receiving one generic method. The scope should state who may approve a concealed test or added time and who owns a question after trades leave. Photographs can document finish condition with authorization, but should remain focused, factual, and free of people, plans, credentials, serial numbers, or private household information unrelated to the issue. Use the latest approved finish schedule and mark revisions, preventing a substituted tile, coating, hardware finish, or cabinet panel from inheriting obsolete care instructions.
Cleaning items stay separate from contractor punch work. Paint correction, caulking, grout repair, hardware adjustment, fixture installation, sealant removal, floor restoration, stone polishing, scratched glass, damaged coatings, and incomplete cabinetry remain with the responsible trade unless a separate qualified provider is appointed. Stickers, protective film, adhesive, paint specks, grout haze, and compound are not assumed removable merely because they appeared during construction. The installer or project lead should identify the surface and approved process before an attempt. We do not use razor blades, abrasives, solvents, acids, or polishing compounds across an unknown new finish. A clear boundary protects the warranty, preserves evidence of a defect, and prevents cleaning effort from being mistaken for acceptance of incomplete work. Assign each non-cleaning observation to a named trade category and location, helping the project team route it without turning the cleaner’s note into a defect diagnosis.
Service chapter
Fine dust travels through ledges, millwork, cabinet interiors, window tracks, fixture tops, floor edges, and adjoining rooms. The team divides the released property into zones and works from higher accessible dry removal toward lower surfaces, using equipment and filtration appropriate to the known material and site plan. Vacuum attachments, wheels, hoses, and cloths are inspected so grit is not carried onto newly finished wood, stone, metal, glass, or paint. Dust is captured rather than blown into the air, and loaded tools move to a controlled service area instead of across completed rooms. Doors, temporary barriers, and building ventilation are managed only through the contractor or property procedure; cleaners do not alter mechanical systems to accelerate the work. Sequence adjoining zones so captured dust and loaded tools move toward the service exit, not back through rooms already released for inspection or furnishing.
One pass may not be the final pass. Dust can resettle after doors move, HVAC operates, protective areas reopen, or another vendor returns. The quote can distinguish an initial removal, detailed clean, and limited touchup around the actual project schedule. That staging is more honest than promising a permanent dust-free result while the site remains active. We inspect raking light, upper edges, hardware, lower corners, and the path used by trades, but do not chase particles into sealed cavities, ducts, mechanical equipment, or inaccessible assemblies. Internal HVAC cleaning, filter service, duct work, and system commissioning belong to the responsible mechanical provider. Post-construction cleaning addresses safely accessible finished surfaces, not the hidden building systems behind them. Define what activity triggers a touchup, such as installer return or furniture delivery, instead of promising another complete pass for any particle seen after handoff.
Service chapter
New kitchens and millwork require identification before moisture or chemistry. Cabinet faces, accessible interiors included in scope, counters, backsplash, sink, fixtures, appliance exteriors, and floor edges are approached according to maker and installer guidance. Dry dust is removed first, then a compatible product is applied with controlled quantity, keeping liquid away from unfinished edges, seams, electrical controls, and recently cured joints. Interior cabinetry must be empty, stable, and released by the installer. We do not dismantle appliances, remove doors or hardware, or correct construction residue with force. If cloth color transfer, surface softening, haze, scratching, or coating change appears during a concealed test, the method stops and the project contact receives the observation. Record the concealed test location and dry result for new cabinetry and counters, giving the owner a practical care reference after the construction team leaves.
Glass, metal, stone, tile, wood, resilient flooring, and specialty coatings each have different stop conditions. Accessible interior glass is checked for film, coating, fabrication debris, scratches, and edge restrictions before approved care; exterior or elevated panes need separate access planning. Stone may be newly sealed or honed, metal may carry a directional grain or protective layer, and flooring may have cure or traffic limits. We use the least aggressive approved method and enough drying time before reopening a route. Etching, deep scratches, adhesive damage, grout discoloration, lippage, coating failure, and installation marks require trade or restoration assessment. Cleaning can reveal the intended finish, but it cannot manufacture a flawless surface where construction has changed the material. Mark floor cure and traffic restrictions at every approach, then remove warnings only through the project’s authorized release rather than a guessed visual check.
Service chapter
The project schedule should name the last dusty trade, cleaning release, inspection, furniture delivery, styling, photography, and occupancy. If painters, punch teams, installers, movers, or landscapers return through finished rooms, identify their protected route and reserve a touchup rather than compressing all cleaning into the first pass. In San Francisco buildings, confirm loading, parking, elevator windows, certificates or registration required by management, quiet hours, and protection rules for common areas. Keys, alarms, temporary access credentials, and door security follow one documented handoff. Equipment and waste stay inside authorized service zones without blocking fire routes, resident circulation, or another tenant’s entrance. Delayed access may require reprioritization by the named project contact rather than unsafe acceleration. Update the shared schedule after every approved change in trade sequence, access, or occupancy so the cleaning team does not arrive against an obsolete milestone.
Weather and exterior work can affect the reveal. Open façades, wet landscaping, balcony projects, exterior glazing, and street soil may continue to introduce dust or moisture after interior detailing. The general contractor or property manager controls when openings, systems, and exterior zones are ready. Cleaning teams do not cross guards, lean through windows, use unfinished stairs, or improvise ladders and lifts to meet a visual deadline. Large equipment, heavy protective coverings, remaining materials, dumpsters, rubble, and trade waste need their assigned provider. When the project requires specialist façade, floor, stone, or glass care, coordinate that work before the final interior pass where possible. The cleanest handoff comes from sequence and ownership, not from repeatedly polishing around active construction. Protect interior routes from known exterior soil sources where the site plan permits, while leaving façade closure, drainage, and landscape controls to their responsible trades.
Service chapter
Final quality control returns to the approved rooms and surfaces. We inspect accessible ledges, millwork, cabinet interiors included in scope, fixtures, appliance exteriors, glass, tracks, base details, and floors after normal settling and drying. Tools, floor protection, temporary signs, and cleaning waste are removed through the agreed route. Inaccessible areas, residual trade material, visible damage, incomplete installation, and surfaces held for specialist care are recorded factually. Condition photographs require permission and a secure project channel. The cleaning walkthrough confirms completion of cleaning tasks; it does not certify construction quality, code compliance, air quality, system performance, or readiness of work controlled by contractors, inspectors, engineers, or environmental professionals. List remaining cleaning, trade, and specialist items in separate closeout categories, allowing the owner to understand what the completed service does and does not resolve.
The handoff should explain which cleaning stage was completed, whether another vendor is expected, which surfaces need restricted traffic or additional drying, and who owns each open item. Manufacturer and installer maintenance guidance can then inform the first occupied weeks, particularly for new floors, stone, millwork, glass, and coated metals. Once the project is stable, Recurring Cleaning may maintain an occupied residence, while a defined touchup can address ordinary soil introduced by styling or move-in. A post-construction service succeeds when the completed architecture is easier to see and use, the project record remains truthful, and unresolved trade or material issues reach the right professional instead of being concealed beneath a short-lived shine. Transfer approved care guidance into the property manual without passwords, bids, internal trade disputes, or temporary site credentials that no longer belong in occupied-home records.
Scope clarity
The confirmed estimate defines the final scope. These boundaries help separate routine cleaning from restoration, repair, hazardous work, and specialist access.
Confirmed scope
Service boundaries
Skye field guides
Use these material-aware guides to prepare the property, recognize scope boundaries, and ask better questions before service day.
Compare the closest service paths, then confirm whether your exact Bay Area address fits the current route.
A detail-focused reset for homes with buildup, overlooked edges, or rooms that need more attention than routine maintenance provides.
Learn more 02Detailed cleaning for empty or nearly empty homes before keys change hands, belongings arrive, or a final walkthrough begins.
Learn more 03Review the San Francisco, Marin, and North Bay communities we consider, then confirm availability for your exact address.
Learn moreDecision guide
Compare fit, boundaries, access, and preparation before confirming the property-specific scope.
Cleaning begins after trades are finished and tools, protective materials, and heavy debris have been removed.
Fine dust can continue to settle, so the quote may separate an initial clean, a detail clean, and a final touch-up.
This service is planned around completed renovation areas, fine construction dust, new finishes, and staged project handoffs.
Heavy rubble, dumpsters, asbestos, lead, uncontrolled silica, biohazards, and other regulated materials are excluded.
The scope can include accessible cabinetry, millwork, ledges, fixtures, appliance exteriors, interior glass, walls, and completed floors.
Those residues are addressed only when removal is safe for the finish and specifically included in the quote.
No. Repairs, caulking, installation defects, paint correction, and other trade work remain separate from cleaning.
Share the renovation area, project stage, material notes, remaining labels, access conditions, and builder punch list.
Manufacturer and builder guidance helps inform how newly sealed surfaces and specialty coatings can be approached.
It reviews the areas in the approved scope without certifying that construction work is complete.
Material-first planning
A clear next step, shaped for this service.
Prepare the finished project for its reveal
Share the project stage, floor plan, material notes, access, and target handoff date so we can define the right cleaning passes.